In order to complete the permanent restoration of the Little Lake Jackson beachfront and the canal system entryway, it was calculated that the removal of an additional 682 cubic yards of sand would be required, at a cost of $11,000. The total cost of beachfront and entryway restoration would be $14,000, which includes the previous $3,000 contributed by Erin Park residents. FDEP authorization was obtained, a local contractor was selected and the project was funded by the Highlands County Tourist Development Council on March 27, 2012.